Launch wind limit: 25 → 20 kt
- T-12QS task
- PO 403Objective
- EO 403.02Objective
- 403.02-3Teaching point
- PC 403Perf. check
Concept · When a manual changes
The Wren-3 drone manual has just moved from Rev A to Rev B. Here is how its qualification standard and training plan could catch up, with the expert’s time spent only where it counts.
The drone, its manual and its course are invented for this page.
01 / 03 · What changed
Any diff tool can mark what moved between Rev A and Rev B. The hard part is knowing what each change means for the course.
34 changes found across 240 pages
6. Confirm that the flight software version matches the approved list in Annex D.
Do not launch when the mean wind exceeds 25 kt 20 kt or gusts exceed 30 kt.
WARNING After a hard landing, do not reuse the battery until it has been inspected.
And 31 editorial changes: spelling, cross-references, renumbering.
Point at a highlight on the pages to read it.02 / 03 · What it means for the course
The AI ranks each change and traces it to the tasks, objectives and checks of the qualification standard (QS) and training plan (TP). The ranking is a suggestion: the expert confirms it.
Launch wind limit: 25 → 20 kt
New warning: inspect the battery after a hard landing
New pre-flight step: check the software version
31 editorial changes
Spelling, cross-references, renumbering. Nothing trainees learn changes. The 12 course references to renumbered paragraphs update on their own.
38 other items: none of the passages they cite changed.
For the school, in the hand-off note
2 lesson plans and 3 simulator scenarios are built on these objectives. They are flagged for the school’s team, which owns them.
Point at a change to isolate its links.
03 / 03 · What the expert decides
The AI doesn’t send the expert documents to review. It asks only where it isn’t sure, and keeps the answer, with its reason, next to the change for the training authority.
AI · needs your call
Performance check PC 403, card 3 gives a 22 kt wind and expects “Launch”. Since Rev B, launches stop at 20 kt §3.4.
I’d lower the card to 19 kt so the expected decision still holds. Or should trainees be assessed on refusing the launch?
Flight instructor · expert
Keep 22 kt. It’s a no-go since Rev B, and spotting a no-go is exactly what they must be assessed on.
AI
Done. Card 3 now expects “Do not launch”. Your reason is saved with the change, for the training authority.
✓ 0 questions left · Rev B ready for sign-off
Wind given to the trainee
22 kt
020 kt limit, Rev B
Expected decision
LaunchDo not launch
The launch limit drops from 25 to 20 kt.
Lower the wind to 19 kt and keep “Launch”.
ProposedWaiting for the expert
Signs off once every question is answered.
One question left. Then Rev B goes to the training authority for sign-off.
Nothing reaches trainees before the training authority signs off. The school then updates its lesson plans and simulator scenarios from the hand-off note.
Each step of this concept rests on a guess. Here are the three I’d test first, and what each answer would change.